Examples of Major Projects Involving Surveyors


Sydney Harbour Bridge

 

Sydney Harbour Bridge was resurfaced in January 2012, closing it for two weeks – the longest period in its 80-year history. Roads and Maritime Services Surveyors were integral to this project; their work starting about 18 months before the resurfacing took place. 

They established benchmarks along the western fence and carriageway. About 2,500 core-holes were drilled, without damaging the heritage-listed concrete, in order to take observations and measurements. These observations were combined with PAVESET computer analysis, to enable Surveyors to control the depths of bitumen and ensure a smooth running surface upon completion. 

Sydney Opera House

 

The shells and tiles of the Sydney Opera House had to be sited to 3mm accuracy. This was the most challenging three dimensional structure ever built in Australia. In the mid-1960s, Sydney only had one computer, the size of a room to assist with the complex Spatial calculations. 
The Surveyors were responsible for ensuring that all 10,000 tile bolts were aligned correctly so that prefabricated tiles would fit like a huge jigsaw puzzle. This was all achieved in the days before portable electronic instruments. Surveyors continue to monitor the Opera House for any signs of settling or deformation.


 


UPCOMING EVENTS
NOV
30
BOSSI Workshop Program 27 - Town Planning - FULL
Suite 702, Level 7, 350 Kent Street
350 Kent Street
SYDNEY NSW 2000
NOV
28
BOSSI Workshop Program 27 - Engineering
Suite 702, Level 7, 350 Kent Street
350 Kent Street
SYDNEY NSW 2000

Members Area

Access Your Member Benefits

Industry-relevant information and documents for ACS NSW members.
 

Use Our Search Facility

The most comprehensive online property search service.
 

CPD Bank

See: www.cpdbank.com.au

  • Track your points
  • Manage your events
  • Stay updated
 

ACS NSW Sponsorship Partners

 
 
© Consulting Surveyors NSW. All rights reserved. Website by Kook